PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued excavation for the underground sanitary piping Facing East (800x600).jpg Continued saw cutting Rahway ave. under the bridge (800x600).jpg Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Sanitary piping at room 175A Facing East (800x600).jpg Sanitary piping at room 175B Facing North (800x600).jpg Unloading shear wall panels onto the 3rd floor for Elev. 1,2,3 Facing South (800x600).jpg Welded extension beam angles at Derrick -3 (2nd Floor) Facing South-East (800x600).jpg Welding beams at Derrick -3 (3rd Floor) Facing East (800x600).jpg
Previous pageNext page Sanitary piping at room 175B Facing North (800x600)
Sanitary piping at room 175B Facing North (800x600)